Acorn Centre

Project Overview

Client: The NHS

Location: Oxmoor, Huntingdon

Architect: Macmon Chartered Architect

Contractor: Gleeson Building

Materials: 5,000m² Rheinzink Natural zinc, 1500m² Composite panels, 40,000m Softwood boarding

CEL installed 5,000m2 of Rheinzink Natural zinc to the roof of the three-storey main building, complete with Rheinzink rainwater gutters and downpipes, vertical cladding to the main façade and feature windows.

Phase two consisted of composite insulated panels, 1100m zinc roof to the main building, vertical cladding and zinc rainwater goods, all visually in sympathy with the phase one work.