Case Studies
Case Studies
Restoration
New Build
Acorn Centre
Brammall Music Building
Church Farm
Crownhill Crematorium
De Montford University
Edinburgh Napier University
Flag Fen
Hampton Hargate Primary
Heathfield
Herbert Art Gallery
Herringswell Manor
Isle of Man
Kings Troop, Woolwich
Long Barn, Cockthorpe
National Museum of Wales
Newnham College
Nottingham Vets School
Palace Theatre, Redditch
Rapier Street
Rawmarsh Joint Services Centre
Risbygate Street, Bury St Edmunds
Selwyn College
Southwell School
The Arc
Vine Inter Church School
Woodgrange Road
Project Overview
Client: Church Farm
Location: Thorington
Architect: Mole Architects
Contractor: Seamans
Value: 80,000
Programme: 12 Weeks
Materials: Mirror Finished Stainless Steel

The Balancing Barn wrapped in mirror finish stainless steel produced by Aperam (Formerly Arcelor Mittall) this project was always going to be a subject of great discussion.
Architects MVRDV and executive architects Mole Architecture have never been a practice to shy away from controversial projects, or ones with a little razzle-dazzle, a bit sashay and shake. Previous buildings include Oslo Opera and New Manor. However this mirror finish panel system settles into the woodland environment gently by reflecting the various colours sympathetically.
0.80mm mirror finish panels used were fixed in sizes up to 900x410mm using the manufacturers design details and CELs own structural design drawings








