Case Studies
Case Studies
Restoration
New Build
Acorn Centre
Brammall Music Building
Church Farm
Crownhill Crematorium
De Montford University
Edinburgh Napier University
Flag Fen
Hampton Hargate Primary
Heathfield
Herbert Art Gallery
Herringswell Manor
Isle of Man
Kings Troop, Woolwich
Long Barn, Cockthorpe
National Museum of Wales
Newnham College
Nottingham Vets School
Palace Theatre, Redditch
Rapier Street
Rawmarsh Joint Services Centre
Risbygate Street, Bury St Edmunds
Selwyn College
Southwell School
The Arc
Vine Inter Church School
Woodgrange Road
Project Overview
Client: Ely Diocese Board of Education & Training
Location: Cambourne, Cambridgeshire
Architect: Design Group, Property & Asset Management
Contractor: Kier Eastern
Programme: Three-phase new build over three years.
Materials: Rheinzink & Softwood boarding

The zinc works on the roof of this new build school near Cambridge were completed in three phases over three years. Some 5,000m2 of preweathered zinc, incorporating the Rheinzink standing seam system, were used.
Because preweathered zinc was used, the phasing of the works was not a visual problem and the completed building is now a template for other roofing systems in the Cambridgeshire educational district.